SOCKETWorx MOC is used to create and manage change orders and work orders on assets that are specified within design-engineering data and documents.
By capturing data changes, document markups, and related files SOCKETWorx assembles so revisions can be made against them.
Management of Change (MOC) events always affect CAD files such as Process and Instrumentation Diagram (P&ID) drawings.
Isolating affected CAD files to change events and staging them for CAD processing is sustainable with SOCKETWorx MOC.
It solves the age-old problem of managing multiple MOC events per drawing. It collects markups, data changes, associated files, and centralizes them as inputs to the change order tasks.
Built-in stages provide document change tracks so orders get processed and stay on the rails. Along the way, it uncovers bottlenecks because it automatically counts the days per stage until change orders are closed.